Image 1
Image 2
Image 3
Image 4
Image 5
Image 6
Image 7
Image 8
Image 9
Image 10
Image 11
Image 12
Image 13
Image 14
Image 15
Image 16
Image 17
Image 18
Image 19
Image 20
Image 21
Image 22
Image 23
Image 24
Image 25
Image 26
Image 27
Image 28
Image 29
Image 30
Vehicle Thumbnail 1
Vehicle Thumbnail 2
Vehicle Thumbnail 3
Vehicle Thumbnail 4
Vehicle Thumbnail 5
Vehicle Thumbnail 6
Vehicle Thumbnail 7
Vehicle Thumbnail 8
Vehicle Thumbnail 9
Vehicle Thumbnail 10
Vehicle Thumbnail 11
Vehicle Thumbnail 12
Vehicle Thumbnail 13
Vehicle Thumbnail 14
Vehicle Thumbnail 15
Vehicle Thumbnail 16
Vehicle Thumbnail 17
Vehicle Thumbnail 18
Vehicle Thumbnail 19
Vehicle Thumbnail 20
Vehicle Thumbnail 21
Vehicle Thumbnail 22
Vehicle Thumbnail 23
Vehicle Thumbnail 24
Vehicle Thumbnail 25
Vehicle Thumbnail 26
Vehicle Thumbnail 27
Vehicle Thumbnail 28
Vehicle Thumbnail 29
Vehicle Thumbnail 30
Year
2018
Engine size
1.5 L
Transmission
Manual
Seats
5
Mileage
63,177 miles
Colour
Silver
Doors
5
Registration
BL67 SXR
Fuel type
Diesel
Body type
Hatchback
Emissions
102 g/km

Description

Boot Space Large/
Fuel Economy High/
Mileage Low
Too Good To Trade – Part of the Mangoletsi Group. You can now purchase a vehicle which previously would have been for “Trade Only”. These are hand-picked based on Age, Milage and Condition, Offering fantastic value for Money. This Mercedes-Benz A180 is presented in excellent condition throughout and comes with 2 keys. Each car comes with - DVLA Registration, Oil And Filter Service, Minimum 9 months MOT or Retested if less than 9 months at the point of sale, Full Experian History Check, 30 Day free Warranty with the option to Upgrade to 3 Months or 12 Months, We’d love to take your car in part ...
Too Good To Trade – Part of the Mangoletsi Group. You can now purchase a vehicle which previously would have been for “Trade Only”. These are hand-picked based on Age, Milage and Condition, Offering fantastic value for Money. This Mercedes-Benz A180 is presented in excellent condition throughout and comes with 2 keys. Each car comes with - DVLA Registration, Oil And Filter Service, Minimum 9 months MOT or Retested if less than 9 months at the point of sale, Full Experian History Check, 30 Day free Warranty with the option to Upgrade to 3 Months or 12 Months, We’d love to take your car in part exchange and promise it will be a painless experience And Giving you cash back is not a problem either. This Vehicle was registered on the 18/01/2018. This vehicle comes fitted with the following features: Apple CarPlay and Android Auto, Bluetooth Connectivity, Front & Rear Parking Sensors, Reversing Camera, 18-inch AMG Twin-Spoke Alloy Wheels, Navigation, Hill Start Assist, Cruise Control, Air Conditioning, Isofix Rear Child Seat Preparation. Debit and Credit card payments are accepted up to the value of £500. On balances over £500 we only accept bank transfers. Every vehicle at Too Good To Trade is advertised exclusively for a period of 30 days before we move them on to auction. call today to secure your appointment FINANCE AVAILABLE from zero deposit!
  • Audio 20 Radio-CD-MP3 Compatibility
  • Media Display - 8in
  • Media Interface
  • Mercedes Connect Me
  • Radio Aerial Roof Spoiler
  • Smartphone Integration
  • ATTENTION Assist
  • Brake-Pad Wear Warning Indicator
  • Controller on Centre Console with Chrome Surround
  • Cruise Control with Limiter
  • Dynamic Select with a Choice of Driving Modes - ECO-Comfort-Sport and Individual
  • Fluid Level Warning Indicator for Fuel - Oil - Coolant and Washer Fluid
  • Light Failure Indicator
  • Outside Temperature Gauge
  • Reversing Camera with Parking Guidelines - 180 Degree View
  • Service Indicator ASSYST
  • Shift Point Indicator
  • Trip Computer in Multi-Function Display
  • Tyre Pressure Monitoring System
  • 18in Alloy Wheels - AMG 5-Twin-Spoke Design - Painted in Titanium Grey with a High Sheen Finish
  • AMG Bodystyling - Front and Rear Apron and Side Skirts
  • Beltline Strips - Chrome
  • Bodystyling - Side Skirts - Body-Coloured
  • Brake Calipers - Mercedes-Benz Lettering on Front
  • Bumpers - Body Coloured
  • Door Handles - Body Coloured
  • Door Mirrors - Electrically Adjustable and Heated with Integrated LED Indicators
  • Electric Windows - 4
  • Exhaust System - Twin Trapezoidal Tailpipes in Polished Stainless Steel
  • Glass - Rear Windscreen - Heated with Timer Control
  • Radiator Grille - Diamond with Pins in Chrome and Silver Louvre with Chrome Insert
  • Rear Fog Light
  • TIREFIT Tyre-Sealant Kit
  • Halogen Headlights with Integrated Daytime Running Lights
  • Headlamp Assist - Automatic Headlamp Activation
  • High Level Third Brake Light - LED
  • Part LED Tail Lights
  • Air Vents with Surround and Cruciform Nozzle in Silver Chrome
  • Ambient Lighting in Headrests and Interior Door Handles
  • Brushed Stainless Steel Sports Pedals with Rubber Studs
  • Centre Armrest - Front with Stowage
  • Cup Holder - Double - Front
  • Direction Indicators with Lane-Changer Function
  • Floor Mats - Red Stitched Edging - AMG Lettering
  • Footwell Lighting - Front and Rear
  • Glove Compartment - Illuminated
  • Illuminated Front Door Sills with Mercedes-Benz Lettering
  • Illumination - Storage Compartment
  • Instrument Cluster with Four Analogue Dials and Needles Suspended in Six-O-Clock Position
  • KEYLESS-GO Starting Function
  • Lighting in Stowage Compartment and Vanity Mirrors
  • Luggage Compartment Cover
  • Rain-Sensing Windscreen Wipers with Two Sensitivity Settings
  • Reading Lights and Console Light in Front and Rear
  • Rear Seats - Split Folding 1-3 2-3
  • Rear View Mirror - Additional Lighting
  • Roof Lining - Black
  • Seat Comfort Package
  • Seats - Front Cushion Length Adjustment
  • Seats - Front Manually Adjustable
  • Sports Seats with Integrated Head Restraints
  • Steering Column - Manually Adjustable for Height and Reach
  • Steering Wheel - 3-Spoke Multi-Function - Trimmed in Leather with Perforated Leather in Grip Area and Flattened Bottom Section
  • Storage Compartment Beneath Load Compartment Floor
  • THERMOTRONIC Luxury Automatic Climate Control - Two-Zone with Display
  • Trim - Carbon-Fibre Look
  • Power Steering - Sports Direct Steer System with Speed Sensitive Servo Assistance
  • Suspension - Comfort - Lowered by 20mm Front and 15mm Rear
  • ABS - Anti-Lock Braking System with BAS - Brake Assist
  • Active Bonnet - Pedestrian Safety Measure which Detects an Impact and Raises Bonnet by 65mm
  • Active Braking Assist
  • Adaptive Brake Assist with Hold Function and Hill Start Assist
  • Adaptive Brake Lights
  • Airbags - Dual Stage - Driver and Front Passenger
  • Airbags - Head and Sidebags - Driver and Front Passenger
  • Airbags - Windowbags for Driver and Front Passenger
  • Alarm System with Immobiliser and Interior Protection - Thatcham Category 1
  • Automatic Child Seat Recognition Sensor
  • Childproof Locks - Manually Operated for Rear Doors and Electrically Operated for Rear Power Windows
  • Crash-Responsive Emergency Lighting
  • Drivers Kneebag
  • ESP - Electronic Stability Programme with ASR - Acceleration Skid Control
  • ESP Curve Dynamic Assist
  • Electric Parking Brake
  • Electronic Key - Chrome Surround
  • First Aid Kit and Warning Triangle
  • ISOFIX and Top-Tether Child Seat Fixing Points in Rear - Two Outer Seats
  • Rear Windscreen Wiper
  • Remote Central Locking and Crash Sensor with Emergency Opening Function
  • Seat Belts - Rear Three-Point - 3
  • Seat Belts Reminder - Front and Rear
  • Seat Occupancy Sensor - Front Passenger Seat

Finance Calculator

£1,899
Repayment period
Apply for finance
59 monthly payments of £162.74
Final payment
£172.74
Cash price
£9,495.00
Customer deposit
£1,899.00
Total deposit
£1,899.00
Amount of credit
£7,596.00
Total amount payable
£11,673.40
Term
60
Option to purchase fee
£10.00
Fixed Rate of interest p.a
5.71%
Representative APR
10.9%